Waste and recycling audit
Hauling agreements are dense, and the invoices that follow them are denser: fuel surcharges calculated on the wrong base, environmental fees introduced mid-contract, container sizes billed larger than what sits in your lot, pickups charged that never happened, escalators applied twice. Each error is small. Across locations and years, they are not.
- Contracting party
- LGA International GmbH
- Telephone
- +1 929 475 8496We work in writing, so that every finding leaves a record you can forward. Email reaches us fastest.
- info@anchorreclaim.comAnswered in writing within 48 business hours
What we look for
Each of these is a rule that exists in writing somewhere — a filed tariff, a signed contract, a state statute — and can be checked against your own documents.
01Contracted rates against invoiced rates
The simplest check in this category, and the one that most often finds something.
02Service levels against actual pickups
Charges for collections that did not happen, or for a frequency the site no longer needs.
03Fuel surcharges on the wrong base
The surcharge formula is in the agreement. It is frequently applied to a figure the agreement does not name.
04Fees introduced mid-contract
Environmental and administrative fees that appear between billing periods without a contractual basis.
05Escalators applied twice
An annual increase applied both automatically and again at renewal.

What to send
Documents you already hold. Nothing to prepare, nothing to export, no access to any system — and nothing is uploaded until the agreement is signed.
01Six to twelve months of invoices
Whatever format you have them in.
02The service agreement, if it is handy
It sharpens the review considerably, but we can begin without it.
We do not need anything that identifies an individual person.
This is arithmetic against published rules, not an inspection of your staff. If a document you are about to send happens to contain names, redact them or send the summary page instead — the arithmetic does not change.
What you get, and what it costs
The deliverable is the same whether or not there is money to recover: a written document that states what was checked, against which rule, and with what result.
How long it takes
Three facts to begin
Your state, your approximate annual spend, and the vendor. That is enough for us to tell you whether a review is worth your time — before any document changes hands.